Transportation Infrastructure

The China-Pakistan Economic Corridor envisions an extensive overhaul of the existing transportation infrastructure in Pakistan and laying out of new routes for the facilitation of transit trade and enhancement of market accessibility.

As an essential part of the CPEC, China and Pakistan have joined hands to building the transportation infrastructure stated below.

#

Project Name

Length (KM)

Completed Projects

1

KKH Phase II (Havelian – Thakot Section)

120

2

Peshawar-Karachi Motorway (Multan-Sukkur Section)

392

3

Orange Line Metro Train – Lahore

27

4

Cross Border Optical Fiber Cable (Khunjrab – Rawalpindi)

820

5

Pilot Project of Digital Terrestrial Multimedia Broadcast (DTMB)

297

6

Hakla – D.I Khan Motorway

Under Construction Projects

7

Zhob – Quetta (Kuchlak) (N-50)

305

8

Khuzdar-Basima Road (N-30)

106

9

Hoshab – Awaran Road Section (M-8)

146

10

KKH Alternate Route Shandur – Chitral Road

153

11

Nokundi-Mashkhel Road

103

In-Pipeline Projects

12

Up-gradation and Dualization of ML-1 and establishment of Dry Port near Havelian

1733

13

Up-gradation of D.I.Khan (Yarik) – Zhob, N-50 Phase-I

235

14

KKH Alternative Route Gilgit-Shandur Road

213

15

Realignment of KKH Phase-I Thakot – Raikot Section

250

16

Peshawar – D.I.Khan Motorway

360

17

Awaran – Khuzdar Road Section (M-8)

168

18

Dir Expressway

29.6

19

DTMB-A (Digitalize the existing three sites of PTV)

Long Term Projects

20

Mirpur-Muzaffarabad-Mansehra Road

200

21

Karachi Circular Railway

43

22

Mashkhel – Pangur Road

200

23

Quetta Mass Transit

24

Greater Peshawar Region Mass Transit

#

Project Name

Length (KM)

Completed Projects

1

KKH Phase II (Havelian – Thakot Section)

120

2

Peshawar-Karachi Motorway (Multan-Sukkur Section)

392

3

Orange Line Metro Train – Lahore

27

4

Cross Border Optical Fiber Cable (Khunjrab – Rawalpindi)

820

5

Pilot Project of Digital Terrestrial Multimedia Broadcast (DTMB)

297

6

Hakla – D.I Khan Motorway

Under Construction Projects

7

Zhob – Quetta (Kuchlak) (N-50)

305

8

Khuzdar-Basima Road (N-30)

106

9

Hoshab – Awaran Road Section (M-8)

146

10

KKH Alternate Route Shandur – Chitral Road

153

11

Nokundi-Mashkhel Road

103

In-Pipeline Projects

12

Up-gradation and Dualization of ML-1 and establishment of Dry Port near Havelian

1733

13

Up-gradation of D.I.Khan (Yarik) – Zhob, N-50 Phase-I

235

14

KKH Alternative Route Gilgit-Shandur Road

213

15

Realignment of KKH Phase-I Thakot – Raikot Section

250

16

Peshawar – D.I.Khan Motorway

360

17

Awaran – Khuzdar Road Section (M-8)

168

18

Dir Expressway

29.6

19

DTMB-A (Digitalize the existing three sites of PTV)

Long Term Projects

20

Mirpur-Muzaffarabad-Mansehra Road

200

21

Karachi Circular Railway

43

22

Mashkhel – Pangur Road

200

23

Quetta Mass Transit

24

Greater Peshawar Region Mass Transit