China’s Gezhouba Group has built an advanced Steel Processing Plant in Pakistan at the construction site of Suki Kinari (SK) Project Hydropower, which is a key project being built under CPEC. This plant comes equipped with a hydraulic press, gantry crane, CNC cutting machine, welding cross arm and a batch of advanced equipment. According to Chinese Embassy, the construction and operation of the plan will promote local employment and improve the skills of the work force.